Home/Invest/Transformative projects

Projects that are transforming the Camp de Tarragona

New industrial, energy, logistics, and agri-food investments, along with major mobility infrastructures, are expanding the territory’s capabilities. These projects incorporate new technologies, diversify economic activity, and improve the territory’s connectivity.

New industry

Lotte Energy Materials

Mont-roig del Camp

Production of elecfoil, an ultra-thin copper sheet used in the manufacturing of electric batteries and other technological applications. It integrates the territory into new value chains linked to electric mobility.

Potential investment€1,200M

Planned plants3

Direct jobs+600

First plant30,000 t/year

Chemistry and circular economy

Ecoplanta de Repsol

El Morell

The first plant in Europe to convert non-recyclable urban waste into renewable methanol for fuels and materials. It closes the cycle between the territory’s waste and the chemical complex, which gains access to circular raw materials.

Approved investment+€800M

Treated waste400,000 t/year

Planned production240,000 t/year

Start-up2029

Energy and hydrogen

T-HYNET de Repsol

Constantí

A 150 MW electrolyzer at the Repsol industrial complex, the largest projected in Spain. It is designed to supply renewable hydrogen to the chemical industry in the Camp de Tarragona and for the production of synthetic fuels.

Power150 MW

European aid€98M

Technologyelectrolysis

Statusfinal decision pending

Energy and hydrogen

Tarraco H2

La Boella area

Off-grid renewable hydrogen plant, powered exclusively by its own solar photovoltaic energy. It starts with 25 MW and expects to reach 150 MW by 2032. Promoted by H2Pro and Sun Systems Group.

Announced investment€304M

Final power150 MW by 2032

First phase25 MW

Associated solarup to 220 MWp

Innovation and agri-food

Hub Ametller Origen

Mont-roig del Camp

Agri-food innovation and production hub, future headquarters for the group’s agricultural R area. It will integrate high-tech cultivation, laboratories, innovation, training, and production and shipping processes.

Planned investment€50M

Surface area100 ha

Planned professionals+500

High-tech greenhouses50 ha

Logistics and port

COSCO and PTP Intermodal Terminal

Port de Tarragona, Moll d’Andalusia

New multipurpose terminal for containers, general cargo, and vehicles, with an associated rail terminal at la Boella. It turns the Port into the group’s intermodal gateway to the Western Mediterranean.

Investment€116.8M

Surface area510,586 m²

Capacity680,000 TEU

Concession50 years

Mobility and connectivity

TramCamp

Metropolitan area

New public transport network to connect the main urban centers and major mobility-generating points. The first phase links Cambrils, Salou, and Vila-seca.

Planned network46 km

Stations47

Interchanges10

First phase€245M

Mobility and connectivity

Camp de Tarragona Intermodal Station

Camp de Tarragona

One of the territory’s major mobility nodes. It will connect the high-speed Mediterranean Corridor with the regional and Rodalies rail network, and facilitate connections with the future TramCamp and Reus Airport.

Functionmodal integration

ConnectsHigh-speed · Rodalies · Tram · airport

Announced amounts, not executed expenditure. Data consulted in November 2026.

The network that makes it possible

Planned electrical capacity to support investment

State electrical planning with contributions from the Generalitat. These are planned network capacities to serve the territory’s new industrial, logistics, and mobility activities, not new generation.

Químico Substation

Petrochemical environment and south of Reus

400 and 220 kV, with 1,200 MW of new transformation and 15 connection positions. 2030 horizon.

Reinforcement of South Reus

Reus

Distribution support position linked to Químico, for industrial, healthcare, and mobility developments.

Francolí and Tarragona

Tarragona industrial environment

Two 220 kV positions in Francolí and three in Tarragona, linked to the Químico substation.

Electrical support for the Port

Port de Tarragona

New electrical support position for port activity, included in the published planning.

Montblanc Substation

Montblanc

220 kV expansion to reinforce distribution and serve a new industrial sector.

Escatrón – els Aubals – la Secuita Axis

Supramunicipal corridor

Line renewal and expansions in els Aubals, la Secuita, and Vandellòs. €271.9M for the entire corridor.

Solar at L’Energètica institutes

Camp de Tarragona

44 actions in educational centers across the territory within the public self-consumption program. 2028 horizon.

Actions in progress. Amounts are not cumulative and do not correspond entirely to the Camp de Tarragona, and actions linked to the Químico substation are not independent projects.

New projects. New connections. New opportunities.

New industry, renewable energy, agri-food innovation, port logistics, and mobility infrastructures expand the productive base of the Camp de Tarragona and generate new connections, activities, and investment opportunities.

Discover the sectors where these investments generate opportunities

Chemistry and energy, logistics, tourism, ICT, foodtech, and the agricultural sector.